
Building Automation Projects

3 building mixed use complex 5 floors underground parking 18 - 27 story structures Zones: 382 hydronic heat pumps 38 garage gas (co)sensors Variable speed control of fans Primary Loop: gas boilers / cooling towers Enertec-BAS DDC building automation

27 Story condominium 4 level underground parking 167 Hydronic heat pumps 26 CO gas sensors Variable speed fan controls Enertec-BAS DDC building automation of all common area hvac, primary loop boilers and cooling tower.

Covington Water District HQ Administration and Operations 15,000 Sq. Ft. Building Automation: Enertec-BAS DDC

3 building mixed use complex 5 floors underground parking 18 - 27 story structures Zones: 382 hydronic heat pumps 38 garage gas (co)sensors Variable speed control of fans Primary Loop: gas boilers / cooling towers Enertec-BAS DDC building automation

CONTACT US:
Control Systems Inc.
T.206.240.1344
© 1997-2018
control systems inc.